Field of the Invention
The present invention relates to electrical energy metering systems and methods of testing electrical energy meters.
Background of the Invention
Electrical energy utilities are frequently required by state or local regulations or by energy customers to verify the accuracy of electrical energy meters operating in the field. To satisfy these requirements, utilities typically incur the expense of initially testing the accuracy of each meter (or a statistically significant number of meters) upon receipt from a manufacturer. Once in service, utilities again incur the expense of testing the accuracy of each meter to verify its continued accuracy from the date of installation. Thus, utilities periodically send skilled meter testpersons to meter sites, particularly those of large energy customers, to perform in-service measurements of the accuracy of meters and perform calibration adjustments, if necessary. Examples of known meter testing devices are described in U.S. Pat. Nos. 4,271,390 to Canu and 4,646,003 to Phillips et el. On occasion, however, meters may need to be removed from the field to be calibrated and this can result in significant additional expense to utilities. All of these expenses are ultimately reflected in higher energy rates for the consumer.
To provide energy at economical rates and maintain quality control over billing operations, utilities typically develop in-house computer databases covering the maintenance histories of all meters in service. Such databases can include information cataloged by meter serial number and/or manufacture or customer name, etc. These maintenance histories can then be used as a form of feedback to utilities and meter manufacturers to ensure accurate energy measurement. However, establishment and maintenance of these databases requires additional computer hardware, software and database personnel which can be expensive.
Accordingly, to improve quality control and provide energy at the lowest possible rates, utilities have begun to demand that meter manufacturers not only provide meters with a high degree of accuracy, but also provide meters that can be easily tested and calibrated. Utilities have also begun to request additional information relative to the specific accuracy of each meter prior to shipment. Manufacturers presently provide this information in media such as printouts or floppy disks; however, this information often needs to be converted to a format which is compatible with the utilities' database and/or re-keyed into the database. This process can be time consuming and expensive.
Thus, notwithstanding these attempts to ensure meter accuracy and maintain accurate billing operations, there still exists a need to provide a more efficient and economical database of meter information and means of verifying meter accuracy.
Summary of the Invention
It is therefore an object of the present invention to provide an electrical energy metering system having an efficient and economical database for maintaining meter calibration data.
It is another object of the present invention to provide an efficient method of recording meter calibration data.
It is a further object of the present invention to provide an electrical energy meter system for facilitating the automated and paperless transfer of meter calibration data from a meter to an external database.
These and other objects and advantages of the invention are provided by an electrical energy metering system having an electrical energy meter, non-volatile factory calibration memory in the meter, non-volatile field calibration memory in the meter and means, responsive to user actuation, for programming the non-volatile factory calibration memory and the field calibration memory with calibration parameters. The meter also preferably includes a protective meter housing, and metering means, register means and display means in the housing.
The calibration parameters typically include full-load, light-load and lag calibration parameters. These parameters are periodically generated and monitored over the life of a meter so that a utility can maintain quality control over its billing operations, by reducing the likelihood that an energy customer will be under- or over-billed because of an inaccurate meter. These parameters can be generated at the factory and during periodic in-service (or meter-shop) testing of the meter under full-load and light-load conditions. The full-load and light-load test conditions are typically based on the particular rating of the meter.
In particular, the non-volatile field calibration memory functions as a built-in or "personal" database of meter calibration parameters and other data for each respective meter. Corresponding calendar dates and times for each of the field tests can also be maintained at adjacent addresses of the field calibration memory so that a chronological history of meter accuracy can be readily downloaded and displayed in the field by the meter's display means, displayed on a separate hand-held computer or displayed on a utility computer system.
The chronological history of meter accuracy is preferably achieved by measuring the operational accuracy of the meter at a first calendar date at respective full- and light-load levels to obtain first calibration parameters and then storing the first calibration parameters in the field calibration memory. These steps are then repeated at second and subsequent calendar dates over the life of the meter. Measuring the operational accuracy of the meter at the first calendar date under either full- or light-load levels typically involves testing the meter with a first predetermined energy quantity (e.g., 500 VAhours) to obtain a measurement of the first quantity (e.g., 500.+-..epsilon. VAhours) and then generating a first calibration parameter based on a difference (.epsilon.) between the first energy quantity and the measurement of the first energy quantity. The first calibration parameter can be expressed as a percentage (e.g., .+-.1% or .+-.0.01) or ratio (e.g., 0.990 or 1.01) or other mathematically equivalent form.
According to a first embodiment of the present invention, programming means is provided by a portable computer which can be operatively connected to the meter's register means by interfacing means such as a serial data link. A communications port is also preferably provided at a face of the meter housing and interfacing means is operatively connected between the port and register means. In this embodiment, programming means is used to communicate with the meter and periodically program the field calibration memory therein with the calibration parameters, based on in-service testing of the meter in the field. Programming means also preferably include means for reading the calibration parameters from the meter's factory calibration memory and field calibration memory and means for displaying these parameters such as by displaying a trend or change in operational accuracy of the meter as a function of time, etc.
According to a second embodiment of the present invention, the above-described programming means is provided in the meter. In this embodiment, an application specific integrated circuit (ASIC) is provided for performing the functions of the register means and programming means. Programming means also preferably includes a keypad, at a face of the meter (or meter housing). The keypad is electrically connected to the application specific integrated circuit.
Accordingly, the first and second embodiments of the present invention include means for metering a quantity of electrical energy delivered to a load; register means for recording the quantity and performing other meter functions; means for displaying the quantity; non-volatile factory calibration memory; and non-volatile field calibration memory. Display means for the first and second embodiments may include an alphanumeric display on a portable computer or a face of the meter, respectively.
Brief Description of the Drawings
FIG. 1 is a front perspective view of an electrical energy metering system according to a first embodiment of the present invention.
FIG. 2 is an electrical schematic representation of the metering system of FIG. 1.
FIG. 3 is an electrical schematic representation of an electrical energy metering system according to a second embodiment of the present invention.
FIG. 4 is a flow-chart of steps corresponding to a preferred method of recording calibration data in an electrical energy meter.
Description of the Preferred Embodiments
The present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which preferred embodiments of the invention are shown. This invention may, however, be embodied in different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art. Like numbers refer to like elements throughout.
Referring now to FIGS. 1-2, an electrical energy metering system according to a first embodiment of the present invention is illustrated. The metering system 10 includes an electrical energy meter 20 having a protective housing 22 (e.g. glass) and means 30 therein for metering a quantity of electrical energy consumed by a load. Register means 40, which is electrically connected to the metering means 30, is also provided for recording the quantity and display means 50 is included for displaying the quantity. According to a preferred embodiment of the present invention, metering means 30 is preferably an electronic circuit embodied in one or more integrated circuits and/or other electrical components. Metering means 30 has inputs for sensing a line current and line voltage from a power line (not shown) and outputs for providing watthour and varhour pulse trains (WATT, VAR) and providing other necessary signals (not shown) to register means 40. Display means 50 preferably comprises a multi-segment liquid crystal alphanumeric display (LCD) at a face 24 of the meter 20, as illustrated. The liquid crystal display 50 can include a six character alphanumeric field 52, three digit numeric field 54, and annunciator segments and pulse and direction indicators (not shown).
Register means 40 is preferably solid-state and includes a register integrated circuit 42 such as an application specific integrated circuit (ASIC). Register means 40 also preferably includes data random-access memory 45 and code random-access memory 46 (RAM) for data storage and program memory, respectively. Display, reset and test switches 47-49, are also provided at the face 24 of the meter, as illustrated. The reset switch 48 may be actuated to reset the meter 20 and allow conversion of the meter from a demand-only mode of operation to a time-of-use and demand mode of operation, for example. A test mode of operation may also be initialized so that calibration testing of the meter 20 can occur. The test mode is activated by pressing the test switch 49. During test mode operation, register means 40 transfers all billing data to memory for later retrieval after calibration testing has been completed. Test data which is accumulated in the test mode will not be added to the billing data. The display switch 47 can also be pressed repeatedly to sequence or scroll through alternative displays for the alternative modes of operation and test, etc.
As will be understood by those skilled in the art, the ASIC 41 includes integrated circuits for performing microprocessor control functions, display control functions, A/D conversion functions, non-volatile memory functions, etc. As illustrated, the ASIC 41 can include a microprocessor portion 42, a read-only memory (ROM) portion 43 and a programmable read-only memory (PROM) portion 44.
In particular, factory calibration memory 44a is provided in PROM 44 for retaining a plurality of factory-installed calibration parameters such as light-load (L/L), full-load (F/L) and lag calibration parameters. Data corresponding to meter serial number, manufacture date and customer ID may also be included therein. Field calibration memory 44b is also provided in PROM 44 for retaining a plurality of field-programmed calibration parameters. Field-programmed calibration parameters also typically include light-load, full-load and lag calibration parameters. The size of the field calibration memory 44b is preferably chosen to account for a lifetime of periodic field or meter-shop calibration testing of the meter to verify its accuracy. As illustrated, PROM 44 is preferably formatted so that calibration parameters which are generated during consecutive field tests can be retained at adjacent memory addresses along with the corresponding test dates and time. The non-volatile field calibration memory 44b functions as a built-in or "personal" database of meter calibration parameters, test dates and other pertinent data which can be used to construct a chronological history of meter accuracy over the life of a meter.
Programming means 70, responsive to user actuation, is also provided for programming a first portion of the field calibration memory 44b with a first calibration parameter(s) (e.g., L/L, F/L, lag) and for programming a second portion of the field calibration memory 44b with a second calibration parameter(s). According to the first embodiment of the present invention, programming means 70 may include a portable (e.g hand-held) computer 71 having a display 72, a keypad 73 for entering data into the meter 20 and optical/electrical data probe 74. Programming means 70 is operatively connected to the ASIC 41 by interfacing means 60 which may include a serial data link 61 or may include an RF transceiver for transmitting and receiving radio-frequency signals to and from a remote source. Interfacing means 60 may also include a transceiver for transmitting and receiving informational carrier signals to and from the power line.
A preferred serial data link is an optical "OPTOCOM.TM." link, marketed by General Electric Company, Meter Division, Somersworth, N.H., although other serial data links such as a modulator/demodulator "modem" (connected to a telephone line or coaxial cable) may also be used. A communications port 62, such as an optical communications port, can also be provided at a face of the meter housing 22. Thus, interfacing means 60 is connected between the port 62 and the ASIC 41. Programming means 70 is used to communicate with the meter 20 and periodically program the field calibration memory 44b therein with updated parameters, based on in-service field or meter-shop testing of the meter. Programming means 70 also preferably includes means for reading the calibration parameters from PROM 44 and displaying these parameters or other data derived therefrom (e.g., histograms, plots, statistical graphs, etc.) on the display 72. As will be understood by those skilled in the art, programming means 70 may include an application specific or general purpose microprocessor for performing the above-described functions.
Referring now to FIG. 3, a second embodiment of the present invention will be described. The metering system 10' illustrated in FIG. 3 is similar to the system of FIG. 2, however, the meter 20' includes a programming circuit 76 in the ASIC 41 and a keypad 75 at the face 24 of the meter (or face of the housing 22), electrically connected to the ASIC 41. According to the second embodiment, the keypad 75 and the programming circuit 76 are designed to perform the functions of the portable hand-held computer 71 and the keypad 73 illustrated in FIG. 2. The display switch 47 may also be actuated to convert the normal display 50 to a display for illustrating calibration parameters and other related data.
Referring now to FIG. 4, the steps of recording calibration data in an electrical energy meter will be described. As illustrated, the electrical energy meter is manufactured, Block 82, and then a factory calibration test is performed to check the accuracy of the meter prior to shipping to a customer, Block 84. From the test, a plurality of factory calibration parameters are generated, Block 86, and then these parameters are stored in the meter's factory calibration memory 44a, Block 88. The corresponding date and time of the factory calibration test are also preferably stored in the meter along with the meter serial number and customer identification number or name which can be useful for tracking the meter in the field.
As illustrated by Blocks 84-86, a factory calibration test is initially performed by the manufacturer to check the accuracy of each meter. The calibration test typically involves measuring the operational accuracy of the meter against a predetermined energy quantity at both light- and full-load levels. These measurements can then be used to derive factory calibration parameters such as light-load, full-load and lag calibration parameters using techniques well known to those skilled in the art. For example, a calibrating infrared light-emitting diode (LED) 55 can be used to facilitate calibration testing of the meter. The LED emits invisible infrared pulses, each pulse representing a quantum of energy measured by the meter. The pulses can be detected by a suitable photo-transistor or similar pickup device, which can be attached to the face of the meter housing 22.
As illustrated by Block 90, the meter under test is then calibrated based on one or more of the calibration parameters. Referring again to FIGS. 1-3, a single-turn full-load adjustable resistor 21, having a maximum range of approximately 3%, and a power factor adjust switch 22, such as a 16-position binary-coded switch, can be used to perform full-load (gain) and power factor adjustments.
After the meter has been calibrated at the factory, Block 90, it is shipped to the utility customer. As illustrated by Blocks 92-98, the utility may perform a pre-installation test of the meter to verify its accuracy prior to installation in the field and then calibrate the meter again, if necessary. The pre-installation calibration parameters derived therefrom can also be stored in the field calibration memory 44b so that a chronological history of the accuracy of the meter can be maintained by the meter. As illustrated by Blocks 100-102, the calibration parameters obtained from the pre-installation test can also be transferred to a utility database such as a mainframe computer. Statistical or similar analysis of the parameters can also be recorded in the utility database, Block 102.
As illustrated Blocks 104-114, the steps 92-102 can be periodically repeated during the life of the meter and the meter can be repeatedly updated to include a personal history of all the post-installation tests.
In the drawings and specification, there have been disclosed typical preferred embodiments of the invention and, although specific terms are employed, they are used in a generic and descriptive sense only and not for purposes of limitation, the scope of the invention being set forth in the following claims.