Background of the Invention
The invention is based on a method for error protected actuation of switching devices of a switching station.
Such a method is known, for example, from EP-A2-0 No. 103 137 the counterpart of which is U.S. Pat. No. 4,507,703. In the known method, position indicating signals of switching devices of the switchgear bay of a switching station having many switchgear bays are used for generating a digital map of the operational state of the switchgear bay by simulating a requested switching operation. The digital maps of the individual switchgear bays are then continuously and cyclicly interrogated and transferred to a central accumulator memory in which they are combined to form an overall map. This overall map is subsequently transferred to each switchgear bay and stored there until the next overall map arrives. When a switching operation is requested, a check is made for switching error protection interlocking conditions in the switchgear bay concerned by means of an overall map arriving subsequent to this request and, if the decision is negative, the requested switching operation is executed. Although this makes it possible to omit interlocking relays, interlocking cable trees and cross-cabling installations in a device for carrying out the aforementioned method, a failure of the central accumulator memory already blocks execution of this method.
Summary of the Invention
The present invention achieves the object of specifying a method of the aforementioned type and an apparatus for carrying out this method which attain a high operational reliability and can be adapted in a simple manner to changes of the configuration of the switching station and/or of the switching-error protection interlocking rules.
The invention makes it possible to decouple the topological configuration of the switching station from the switching-error-protection interlocking rules. As a result of this decoupling, changes can be carried out in the topological configuration of the switching station without completely redesigning the previously used switching-error-protection scheme on account of the changed topological configuration. Instead, the previous switching-error protection can be set up again if only the changed topological arrangement of the switching station is covered by the switching-error-protection system, retaining the switching-error-protection interlocking rules already stored. Correspondingly, changes can be carried out in the switching-error-protection interlocking rules without completely redesigning the previously used switching-error protection.
Brief Description of the Drawings
In the text which follows, an illustrative embodiment of the invention is explained in greater detail with the aid of the drawing, in which:
FIG. 1 shows a circuit diagram of the high-voltage switching station, consisting of three feeders and comprising a device for carrying out the method according to the invention for error-protected switching of the switching devices of this station.
FIG. 2 is a data flow chart for the error-protected switching operation of the switching devices of the high-voltage switching station according to FIG. 1.
FIG. 3 is a graph of a basic set of topological elements forming the basis of the method according to the invention.
FIG. 4 shows a single-line diagram of a feeder of the high-voltage switching station specified in FIG. 1, with the aid of which a topological configuration of the feeder is shown at (a) and the current operating state of this feeder is shown at (b).
FIG. 5 shows a block diagram of two microcomputers for implementing the data flow chart of FIG. 2.
Detailed Description of the Drawings
The high-voltage switching station shown in FIG. 1 contains, for example, three feeders I, II and III. Each of these feeders is provided with high-voltage components, shown thickly drawn, such as busbars B, lines L and switching devices SW, and components, shown thinly drawn, for error-protected switching operation of the switching devices SW of this high-voltage switching station.
The high-voltage components of each of the three feeders I, II and III can have any arbitrary topological arrangement conforming to the regulations. Thus, for example, in feeder I, a circuit breaker CB is shown which is connected between the busbar B and the line L and which can be connected to the line L, or disconnected from it, via an isolator IS. In addition, three earthing switches ES are provided which in each case connect or disconnect one connection of the circuit breaker CB and of the isolator IS and the common connection of circuit breaker and isolator to earth or from earth, respectively. In the feeders II and III, the topology is only symbolically indicated by specifying in each case a busbar B, a switching device SW and a line L.
The switching devices SW have in each case position indicating contacts K.sub.I, K.sub.II, and K.sub.III providing signals which indicate the switching state of the associated switching device SW. The signals are supplied via a databus DK.sub.I, DK.sub.I and DKIII associated with each feeder I, II and III, and local data links ON.sub.I, DN.sub.II and DN.sub.III to the input of a data acquisition and data processing unit E.sub.I, E.sub.II and E.sub.III associated with the respective feeder I, II and III. An output of each of the three data acquisition and data processing units acts in each case via a databus DO.sub.I, DO.sub.II and DO.sub.III on operating means O.sub.I, O.sub.II and O.sub.III of the switching devices SW of each of the feeders I, II and III.
The data acquisition and data processing units E.sub.I, E.sub.I and E.sub.III have in each case another input and another output which are connected to a data patching unit DR via remote data links DF.sub.I, DF.sub.II, DF.sub.III. This makes it possible to establish communication between the data acquisition and data processing units. In corresponding manner, communication between the data acquisition and data processing units can also be made possible by the fact that the data acquisition and data processing units are switched via remote data links in the form of a ring (drawn in dashes) or of a bus or are connected to each other meshed together in the form of a network. In addition, it is also possible to provide, instead of the distributed data acquisition and data processing units allocated to each of the feeders, a single data acquisition and data processing unit which receives and centrally processes the signals of the position indicating contacts of the switching devices of the feeders via remote data links and sends commands to the operating means of the switching devices of each of the feeders.
Each data acquisition and data processing unit also has an input which is supplied with signals associated with the switching operation request commands KA, KE signals by means of which operation of one of the switching devices SW of one of the feeders is to be effected.
The current signals of the position indicating contacts K.sub.I, K.sub.II and K.sub.III of each of the switching devices SW of the high-voltage switching station, reaching each of the data acquisition and data processing units E.sub.I, E.sub.II and E.sub.III, are stored in the respective data acquisition and data processing unit at K during a short period in which the position indicating contacts of all switching devices of the high-voltage switching station are interrogated, as is shown in FIG. 2. Before this, a check is made whether a signal is present which contains an undefined state of one of the switching devices SW, for example, a current operation or a failure. If such a signal is present, a blocking signal KB is formed which prevents switching operation request commands KA and KE from being passed on.
The signals of the position indicating contacts for all switching devices SW of the high-voltage switching station, stored in memory K, are logically combined via a control program stored in a memory P with data which are stored in a memory T and relate to the topological configuration of the high-voltage switching station. In this context, topological elements describing the current operational state are formed which are temporarily stored in a memory AT. The topological elements stored in the memory AT are then called up via the control program provided in the memory P and are logically combined with error-protected switching interlocking rules which, independently of the stored topological arrangement of the high-voltage switching station, are stored in a memory V. In this arrangement, the release or the blocking of a switching operation request command KA, KE possibly present is allocated to each switching device of the high-voltage switching station and this allocation, designated as release pattern, is stored in a memory F.
The error-protected switching interlocking rules are based on a basic set of topological elements which can be allocated to any arbitrary switching station. They make it possible to determine a release or a blocking of the switching operation request command KA, KE for each of its switching devices, independently of the topological configuration of this arbitrary switching station. In this context, it is advantageous, in view of a change of the error-protected switching interlocking rules, which may be desired for reasons of operating philosophy, to store rules concerning the operational reliability of the switching station and the behavior of the switching devices during a switching process and/or during an undetermined switching state, in a memory portion VS and, independently of this, to store, in a part memory VP, rules which relate to the operating philosophy and, for example, increase the operational reliability of the switching station during undetected and unintentional changes in potential, always provide the possibility of selectively switching a feeder by means of a circuit breaker and/or always make it possible to maintain prescribed switching sequences.
A switching operation request command KA, KE for one of the switching devices, present at the data acquisition and data processing unit, is either released or blocked after interrogation of the release pattern so that an error-free switching operation request command KF to the switching device selected is present at the output of the data acquisition and data processing unit.
The basic set of topological elements is selected in such a manner that all switching states are simulated and that they can be used for describing all the error-protected switching interlocking rules. The topological elements therefore represent states and characteristics which are relevant to interlocking such as, for example, equality of potential (current link), level of potential (active, passive, earthed) and adjacency (for example, relationships between adjacent switching devices and feeders).
The topological elements are listed in the Tables 1 and 2 and are subdivided into topological primitives and topological compounds of the topological primitives.
Generally, therefore, an open switching device SW can be contained in two different topological elements (with the exception of the element SEC) which are arranged in each case at one of the two switch connections. If the switching device SW is a part of a loop, both topological elements correspond to each other. A closed switching device SW is always contained in a single topological element.
The boundaries of all topological primitives are fixed. The topological compounds have either fixed lengths or their lengths change during the switching. The former, therefore, determine local characteristics, that is to say, adjacency relationship (SPI, SPC, SEI, SEC), and the latter determine characteristics of the overall system.
The error-protected switching interlocking rules can now be specified with the assistance of the topological elements defined above and are listed in the Table 3 which follows.
In Table 3, ij designates topological elements which are arranged on both sides of the switching device to be operated. It can be immediately seen by checking that the error-protected switching interlocking rules defined by means of the topological elements can withstand all requirements. They are independent of the set-up of any arbitrary switching station. In addition, additional rules can be added or certain ones of these rules can be canceled without having to change the rules already in existence.
When carrying out the method according to the invention, first the topological configuration of the switching station is stored. This task can be handled by a computer (host computer) into which the topological primitives such as nodes and switching devices present in the single-line diagram of the switching station are entered. During this process, the nodes are consecutively numbered and their relationships to adjacent nodes are established.
In the case of the feeder I specified in the single-line diagram of FIG. 4(a), the topological configuration is covered, for example, by the fact that the nodes are marked by reference symbols 4, 5, 7, 9, 11 and 12, that the switching devices are specified which establish the relationship between adjacent nodes such as a circuit breaker Q0 between nodes 4 and 5, an isolator Q9 between nodes 5 and 7 and one earthing switch Q51, Q52 and Q8 each between nodes 4 and 12, 5 and 11 and 7 and 9, and that, finally, the electrical condition of boundary nodes is specified by additional markings such as, for example, a for active and e for earthed like, for example, the active state of nodes 4 and 7, due to the busbar B and the line L, and the earthed state of nodes 9, 11, 12, respectively.
Using the current signals of the position indicating contacts of all switching devices of the high-voltage switching station, the current operational state of the feeder, established by topological elements, can then be determined which is graphically shown in FIG. 4(b). In this diagram, crossbars above the designations show that the isolator Q9 and the earthing switches Q51, Q52 and Q8 are open. In contrast, the circuit breaker Q0 designated without a crossbar is closed.
The determination of the current operational state of the feeder I starts from a boundary node having known electrical characteristics, for example, the earthed node 12, and proceeds to the next node, for example 4. In this procedure, the position indicating signal of the earthing switch Q51 is taken into consideration and by this means, and the position indication of the circuit breaker Q0, the electrical state of node 4 is determined. This also takes into account whether some switching device is just performing a switching operation or whether it has been indicated as not being available. All nodes stored during the acquisition of the topological configuration of the feeder I are successively called and their electrical state is determined in corresponding manner. As specified in FIG. 4, the current operational state of feeder I determined in this manner contains active topological elements, for example a sequence SA.sub.1 or SP which comprises the circuit breaker Q0 and the busbar B and is bounded by the open earthing switches Q51 and Q52 and the open isolator Q9, which is active as the busbar B is live and is then designated by SA.sub.1 and which is passive as the busbar is isolated and is designated by SP, and an active sequence SA.sub.2 comprising the line L and bounded by the earthing switch Q8 and the isolator Q9.
Using the assistance of these topological elements, a check can now be performed with the aid of the stored error-protected switching interlocking rules by interrogating whether a switching operation request command to one of the switching devices Q0, Q9, Q51, Q52 and Q8 is to be released or to be blocked. Thus, rules 12 and 31 show that, for example, the open isolator Q9 must not be closed and rule 11 shows that the earthing switches Q51, Q52 and Q8 must not be closed. In contrast, the circuit breaker Q0 may be opened.
In this manner, a blocking or releasing state is allocated to each switching device. If therefore a switching operation request command is issued to one of these switching devices, this command is released or blocked depending on the characteristic of the topological elements allocated to this switching device.
FIG. 5 shows a preferred device for carrying out the method according to the invention described above. The device shown in FIG. 5 comprises two microcomputers MR.sub.1 and MR.sub.2 which communicate with each other via two data lines. The computer MR.sub.1 is provided with a central databus DB.sub.1 which is connected to a microprocessor MP.sub.1 and to the memory K for receiving the signals of the position indicating contacts K.sub.I, K.sub.II, K.sub.III of the switching devices of the high-voltage switching station, to the memory T for receiving the topological configuration of the high-voltage switching station, to the part memory VS for receiving the mandatory rules, to the memory portion VP for receiving the rules dependent on the operational philosophy of the high-voltage switching station, to the memory AT for receiving the topological elements establishing the current operational state of the high-voltage switching station, to the memory P for receiving the control program and to the memory F for receiving the release pattern. In this arrangement, the memories K, AT and F are preferably constructed as RAMs, the memories VS and R are preferably constructed as PROMs and the memories T and VP are preferably constructed as EPROMs.
The computer MR.sub.2 is provided with a central databus DB.sub.2 to which are connected a microprocessor MP.sub.2 and a data input and data output device DEA and a data input device DE. The signals of the position indicating contacts K.sub.I, K.sub.II and K.sub.III of the switching devices SW of the high-voltage switching station are entered via the data input and data output device DEA and are conducted via the databus DB.sub.2 and the data line DLK into the memory K of the microcomputer MR.sub.1 where they are stored. In the manner described above the release pattern of the switching devices of the high-voltage switching station, stored in the memory F, is determined from the position indicating signals stored in the memory K and from the information items stored in memories T, VS and VP. This release pattern passes via the data line DLF to the microcomputer MR.sub.2. In this microcomputer, an error-free switching operation request command KF, which is passed to the switching device concerned via the data input and data output device DEA, is determined from the release pattern and a switching operation request command KE and KA present and supplied via the data input device DE.