Background of the Invention
The present invention relates to a method and a device for driving down casings to undisturbed ground without essentially displacing or spoiling sensible overburden and sensible structures. In the casings piles or the like can be driven down for foundation or anchoring in more solid ground.
Sensible overburden is for instance cultural layers from earlier civilizations that can be found under the ground surface having a thickness of up to 3 m. The cultural layers are a source of knowledge for the archeologist to learn about life and human beings during earlier epoches. The cultural layers are in some countries protected by law and must not be ruined.
Sensible structures are for instance walls of unhewn stone for older buildings, especially while works are going on for reinforcing the fundament or sheet piling in or adjacent to the structures. These works must be carried out very carefully if no permanent damage shall occur.
The main characteristics of the invention are that a drilling device that is operated by compressed air is surrounded by a casing, said drilling device at its lower end being provided with adjustable exhaust channels that direct the major part of the compressed air upwards to lead it away between the drill stem and the casing together with the cuttings. Due to the fact that the exhaust channels are adjustable, the intensity of the part of the compressed air directed downwards toward the drill bit can be adapted to the nature of the material that is penetrated. By jet action said part of the compressed air can be led upwards along the grooves on the side walls of the drill bit. The invention also relates to the design of these grooves having a lower narrow inlet and an upwards continuously increasing area. Said design makes it impossible for the cuttings to stick on their way upwards.
The Drawing
A preferable embodiment of the invention is described in the following with reference to the enclosed drawings where
FIG. 1 discloses a longitudinal section of the device according to the invention;
FIGS. 1A-1E disclose sections along A, B, C, D and E in FIG. 1;
FIG. 2 is a view corresponding to FIG. 1 showing the flowing of the compressed air;
FIG. 3 illustrates schematically the different working phases when piling in a sensible overburden; and
FIGS. 4A-4D illustrate schematically the different working phases when piling sensible fundaments for reinforcing buildings.
Detailed Description of a Preferred Embodiment of the Invention
FIG. 1 discloses in section a device for overburden drilling comprising a rotating drill 1, that is surrounded by a casing 2. The lower part of the drill, i.e. the drill bit, is shown in the figures as a separate detail. The drill bit is assembled of a guiding device 11, reamer 12 and pilot bit 13. The drill also comprises an exhaust channel 14 for the compressed air operating the drill. These details are known per se. According to the invention the exhaust channel 14 is provided with a control valve 141. Above this control valve 141 there are exhaust channels 142 for the main part of the compressed air, said exhaust channels 142 being provided with flow conducting inserts 143 having passages whose areas are adapted to the material that the device is to penetrate. The inserts 143 are accessible for exchange in order to carry out a coarse adjustment, if necessary, before starting a new drilling cycle. The minor part of the compressed air, that passes through the control valve 141 for prudent flushing around the drill tip, thereafter is sucked upwards along grooves 144 on the side walls of the drill bit through jet action from the compressed air that is rushing out directed upwards from the exhaust channels 142 through the inserts 143. By having the grooves 144 designed with a narrow lower inlet and a gradually upwards increasing area, the cuttings can never stick anywhere on their way upwards and obstruct the channels.
FIG. 2 discloses in section the way of the compressed air through the drill. The compressed air is with great power rushing through the exhaust channel 14 (arrow A) and is to a major extent pushed backwards by the constriction in the control valve 141. The air then continues through the upwards inclined exhaust channels 142 having inserts 143 (arrow B) and then further upwards together with the cuttings between the drill shank and the casing (arrow C). The minor part of the compressed air, that flows through the control valve 141 (arrow D) for prudent flushing around the drill tip, is sucked upwards along the grooves 144 in the side walls of the drill bit (arrow E) through jet action from the compressed air that is rushing out in an upward direction from the exhaust channels 142 through the inserts 143.
FIG. 3 discloses the different working phases when the casing and the drill is driven down into the overburden 15 to a level just below the lower edge of the cultural layer. After the drill has been drawn up piling can take place through the casing without disturbing the cultured layer.
Phase 1
Mobile drill tower with casing 2 and drill 1 mounted, the tower being moved to the drill site.
Phase 2
The casing 2 is displaced downwards into the overburden through the cultured layers.
Phase 3
The casing 2 is driven down in the overburden to a level just below the lower edge of the cultural layers.
Phase 4
A pile 16 is lowered into the casing.
Phase 5
The pile 16 is driven down into the overburden to a predetermined depth.
Phase 6
The pile 16 has reached the predetermined depth (driven to a stop in friction material) and then cemented 18 in the casing.
FIGS. 4A to 4D disclose the different working phases when the casing and the drill are driven down through a fundament of unhewn stone.
Phase 1 (FIG. 4A)
When the fundament 19 has been reinforced in certain areas 20 the drilling device can be entered on the floor above the base fundament.
Phase 2 (FIG. 4B)
Casings 2 are driven through the fundament 19 down to a level just below the lower edge of the fundament 19.
Phase 3 (FIG. 4C)
Steel piles 21 are driven down through the casings 2 until the end 22 of the piles 21 bear against the rock.
Phase 4 (FIG. 4D)
After the steel piles have been driven down to a stop the drilling device is taken away. The damages of the fundament caused by the drilling are filled with concrete 23.
The invention is of course not restricted to the above described embodiments but many modifications are possible within the scope of the appending claims.