Background of the Invention
For many years load demand control systems have been in use; however, with the recent increase in the cost of electrical power, load demand control systems are becoming more of a necessity for installations wherein a number of electrical loads are used. It is possible to shed certain electrical loads during certain periods of time to maintain the average electrical load input to the installation below some predetermined value. Specifically, a conventional demand control system senses the incoming power to an installation and controls the number of operating loads to maintain the incoming power below some predetermined value. If a particular load is to be operated and has priority over the other loads, upon the operation of the priority load, the demand control system would turn off or shed other loads which have a lower priority to maintain the incoming power demand within certain limits.
As most electric utility companies charge commercial users for the total kilowatt hours of electrical energy used in a given period, such as each month at a rate depending upon the peak kilowatts of power averaged over any short interval of time, such as fifteen minutes, during any time each month, it is important to reduce short peak loads.
When a commercial user or an installation has a large electrical load that must be periodically energized, it is not always possible to shed other loads to the extent necessary to keep the total kilowatt energy use for any interval as low as desired. There is an incentive for a commercial user to anticipate the operation of large loads and reduce the electrical load peaks which extend over portions of a preselected time interval.
Summary of the Invention
The present invention is concerned with a load demand control system for maintaining the average electrical power use for any time interval (known as the moving time interval) of an installation below some average limit or peak by anticipating the operation of a large electrical load device which would unduly raise the average electrical load demand with conventional load shedding. Specifically, the load demand control system makes use of a timer control which is operated each time the large electrical load device is to be operated. The timer control resets the control point of the load demand control to cause it to shed other low priority loads for a predetermined period of time before, during and after the operation of a larger load. After operating under the lower load demand level for the first predetermined period of time, the timer control brings on the operation of the larger load for an intermediate period of time; so that, the average for a preselected time interval is well within the required limits.
Brief Description of the Drawing
FIG. 1 is a schematic representation of the load demand control system wherein the timer is used to commence the operation of a particular large load installation,
FIG. 2 is a graphical representation of the average total load for a period of time for the particular installation showing a 90 kw peak load without a load demand control system,
FIG. 3 is a graphical representation of the average total load for a period of time for the particular installation showing a 75 kw peak load using a conventional load demand control system, and
FIG. 4 is a graphical representation of the average total load versus time showing a 60 kw peak load using the present invention.
Description of the Preferred Embodiment
Referring to FIG. 1, a load demand control system is shown for an installation such as a deep fat fryer in a fast food outlet, which receives power from a conventional three phase power source 10 over the electric power distribution wires 11. A load demand panel 12 of a conventional type, such as the W977A DEMAND CONTROL manufactured by Honeywell Inc. has an input circuit or sensing circuit 13 for receiving a signal indicative of the input electrical power over wires 13 to the installation. Specifically, the input circuit 13 has current sensors 14 and voltage taps 15 which are connected to provide a signal indicative of the incoming electrical power or kilowatts to the panel 12. The panel has a plurality of switches or relays 20, 21 and 22 which are connected to control the operation of different loads such as loads #1, #2 and #3 so that when the incoming power to the installation exceeds some predetermined value as can be preselected, the load demand control panel can operate the switches and turn off certain loads to cut down the incoming power demand from source 10. A setpoint input circuit or input power reset control 23 provides for an adjustment or change in the predetermined input electrical power to be maintained by the load demand control system.
In the particular installation used with the load demand control system of this invention, a large electrical load is being controlled, such as load #4. Load #4 is a deep fat fryer 24 which when once started for a preselected time of operation cannot be shed by a load demand control panel. As the power company measures the power or kilowatt average over a certain period of time such as a fifteen minute interval, the dotted line in FIGS. 2, 3 and 4 show a fifteen minute moving average of the total load. A timer control 25 is used to anticipate the operation of load #4 to reduce the electrical power demand over the line for a first predetermined period of time by resetting the control point of panel 12 at input 23. For a first predetermined period of time such as the first eight minutes, other loads are shed and the deep fat fryer load is subsequently energized. Thereafter for a second predetermined period of time, such as eight minutes, the load is again reduced. Thus the average of the total load over any fifteen minute time interval will be maintained below certain predetermined limits.
Specifically, a manual switch 30 controls the initiation or operation of timer control 25 which is a conventional timer for operating switches or contacts 31 and 32. Upon the operation of the timer, switch 31 is first closed to reset the control point of load demand control panel 12 for a first predetermined period. Switch 32 is subsequently closed approximately four minutes later to commence operation of a second timer control 33. Control 33 is normally a part of the deep fat fryer installation or load #4 and has a starting circuit 34 which can be connected to switch 32.
Control 34 is a conventional timer to operate switches 35 and 36 in sequence. Switch 35 first closes upon closure of circuit 34 to energize pump 40 to pump the stored oil into fryer 24. Subsequently, such as four minutes later, switch 36 closes continuously for eight minutes to operate the fryer 24. Upon termination of the fryer operation at the end of the eight minutes, by switch 32 opening, switches 35 and 36 open and the oil will drain back to the storage tank to be held for another operation.
Timer control 25 maintains switch 31 closed for another eight minutes to keep the load demand panel reset for a second predetermined period before terminating its operation.
Operation of the Invention
Assuming that the heater 37 of the deep fat fryer requires approximately 80 killowatts (kw) of electricity, without a load demand control of any type, the operation would be as shown in the graphical representation in FIG. 2. With a normal total load of 50 kw, upon the operation of the deep fat fryer for an eight minute time period, the total demand would increase to 130 kw and if persistent for the next eight minutes, the average power over any fifteen minute moving interval would peak to approximately 90 kw.
With a conventional load demand control system, an operation as shown in FIG. 3 takes place. Assuming that the average load for the first eight minutes was 50 kw, upon the operation of the deep fat fryer to add the additional 80 kw, the demand control sheds all low priority loads, which in this case is approximately 30 kw. For the next eight minutes, the load is 100 kw to provide the average power over any fifteen minute interval to peak at 75 kw.
With the present invention using a load demand control system with anticipation, the average total power demand (shown by the dashed lines in FIG. 4) over any fifteen minute moving interval is substantially reduced to have a 60 kw peak load. Referring to the graphical representation in FIG. 4, assume that the average load was 50 kw with loads #1 and #2 in operation as shown in FIG. 1. Upon the need for operation of the deep fat fryer load #4 or heater 34, the operator pushes button 30 to commence the operation of timer control 25 and thus the timing sequence. Initially, the timer control closes switch 31. Switch 31 provides for a setpoint adjustment of the load demand control panel to reduce the value of the predetermined load allowed to be drawn from the power source 10 which instantly requires that the load demand control panel shed other low priority loads. Assuming that load #1 is a low priority load, switch 21 of panel 12 opens and load #1 is deenergized to drop the total load to the installation to a 20 kw level as shown at the eight minute time. The fifteen minute moving average of the total load begins to drop as shown by the dashed line. Four minutes later, switch 32 of the timer control closes the circuit for operation of the deep fat fryer. Switch 32 of timer control 25 actually replaces a momentary normal start button of the existing deep fat fryer timer control 33 which is a part of the deep fat fryer installation.
The deep fat fryer then operates normally under control 33 to first pump oil into fryer 24 for four minutes and then operate heater 37 for eight minutes. The deep fat fryer operation cannot be interrupted. When timer cntrol 33 finishes its operation at the sixteen minute time of FIG. 4, switches 35 and 36 open. At the termination of the operation of the deep fat fryer, the total load is then reduced to 20 kw and maintains such for the next eight minutes until the total time period of 32 minutes is reached. As can be seen by the dotted line in FIG. 4, the fifteen minute moving average of the total load at no time exceeds a 60 kw peak level for any fifteen minute interval of time.
By use of the anticipation control, the average kw peak is much lower than the conventional demand control and the cost of electrical power to the user is greatly reduced. With a large load operated even for a short period of time, less loads would need to be shed to reduce the average total load over any time interval. The large load operation would have to be less than the fifteen minute time interval used by the utility company for load average measurement.