Brief Description of the Drawings
FIG. 1 is an elevation view of an oxygen converter vessel and certain of the structures normally associated therewith in a steelmaking plant and illustrates the new method;
FIG. 2 is an elevation view of the converter vessel per se illustrating the hinge and lift bracket arrangement;
FIG. 3 is an elevation view of the converter vessel, with the top section thereof being supported on the operating platform in the final position assumed thereby on removal or the initial position for replacement of the top section;
FIG. 4 is a perspective view of the hinge arrangement which serves to interconnect the top and bottom sections of the converter vessel during the course of removal or replacement of the vessel top section.
Detailed Description
With reference now to the drawings, FIG. 1 shows an oxygen process converter vessel 10 which is, per se, of conventional construction and is rotatably supported on oppositely directed trunnions 12, the latter being mounted in bearing blocks. 14 supported from suitable pedestal means 15. A suitable motor drive (not shown) is connected to one of the trunnions 12 thereby to effect rotation of the converter vessel 10 about the rotation axis defined by such trunnions.
The vessel 10 includes a lower body section 18 and a generally conically shaped top section 20, both the body section 18 and top section 20 having mating annular flange portions 22 and 24 respectively which are normally secured together by means of a plurality of circumferentially spaced apart bolts (not shown) extending through the juxtaposed flanges 22 and 24.
Both the top section 20 and body section 18 are lined with refractory brick in the usual manner. The refractory brick, as well as other portions of the vessel 10 gradually deteriorates as a result of the severe operating conditions encountered during normal usage, such deterioration being particularly severe in the case of the top section 20.
The other structures normally associated with an oxygen converter vessel of the type shown need not be described here since they are very well known to those skilled in the art. However, it is noted here that a horizontal operating platform is provided closely adjacent the converter vessel that portion of the operating platform which is located to the charging side of the converter vessel being designated by the reference numeral 26. In addition, as illustrated in FIG. 1, there is provided an overhead charging crane assembly for the converter, which assembly is designated by reference numeral 28. The charging crane includes a travelling powered winch assembly 30 which travels back and forth along track assembly 32. Suspended from the powered winch 30 is a lift hook assembly 34.
In accordance with the invention, a hinge connection 36 is provided between the top section 20 and the body section 18 of the vessel. The hinge 36 is located to that side of the vessel which is remote from the charging side 26 of the operating platform when the vessel is in the upright position. The hinge 36 is more clearly shown in FIG. 4 and it will be seen that it comprises sturdy hinge elements 38 and 40 securely welded to the flange members 24 and 22 respectively of the top and body sections of the vessel 10. A sturdy hinge pin 42 passes through the respective hinge elements 38 and 40 and defines a hinge axis which is parallel to the rotation axis of the vessel 10 as defined by the opposed trunnions 12. The hinge pin 42 includes a removable nut at one end thereof (or other suitable removable means) which can be removed, thus permitting the hinge pin 42 to be removed in the endwise direction to separate the hinge elements 38 and 40 from one another.
The top section 20 of the vessel is also provided with lifting brackets 44 provided on that side of the top section nearest the charging side 26 of the operating platform. The lifting brackets may be of a very simple construction and may be of any suitable design so long as cables may be attached thereto to permit lifting upwardly of the top section 20 during the vessel top removal or installation procedures which will now be described. It will be assumed that the hinge 36 has been previously installed and that the various bolts interconnecting the flanges 22 and 24 have previously been removed. Heavy cables 46 are connected to the lifting brackets 44 on the top section 20 with the upper ends of such cables being attached to the lift hook assembly 34 of the charging crane 28. The converter vessel 10 is then slowly tilted toward the charging side 26 of the operating platform. At the same time as the tilting action takes place, lifting forces are applied to the vessel top section 20 via hook assembly 34, cables 46 and lift brackets 44. By virtue of the combined tilting action of the vessel 10 and the lifting action, the top section 20 is caused to pivot relative to the body section 18 about the hinge axis defined by hinge 36. This action eventually causes the top section 20 to assume the intermediate position illustrated in phantom in FIG. 1. The lifting forces continue to be applied to lift brackets 44 as rotation of the vessel body 18 is continued. Both the rotation action and the lifting action are carefully coordinated thereby to maintain the top section 20 in suitable orientation during the procedure. The hook assembly 34 is gradually moved upwardly and outwardly from position A to position B, position B corresponding to the intermediate position of the top section as noted above, with the hook assembly 34 being gradually shifted outwardly and away from the body of the vessel 10 and being lowered somewhat to position C which is the final position occupied by hook assembly 34, at which point the body section 18 of vessel 10 has been rotated sufficiently as to position the top section 20 on the charging side 26 of the operating platform. The above operation is, of course, accomplished in as smooth a fashion as possible thereby to avoid damage to the equipment having regard to the extremely heavy weights involved.
After the vessel top section 20 has been positioned on the operating platform, the hinge 36 is dissassembled by removing hinge pin 42, following which the top section 20 may be removed from the operating platform and taken to a repair site for relining etc., as required.
The technique for installing the repaired or a replacement vessel top section 20 is essentially the reverse of the procedure described above. Firstly, the top section 20 is located on the charging side 26 of the operating platform such that the hinge elements 38 and 40 are in proper juxtaposition with one another following which the hinge pin 42 is inserted. Following this, the body section 18 of the vessel is very slowly rotated from its inclined position towards the upright position while simultaneously applying lifting forces to the top section 20 via the previously described bracket means 44, cables 46 and charging crane lift hook assembly 34. This action is again accomplished as smoothly and as carefully as possible thereby to control the orientation of the top section and such that the top section is lifted upwardly and carried away from the charging side 26 of the operating platform. Thus, the top section 20 gradually pivots relative to the body section 18 about the axis defined by hinge assembly 36 until the top section 20 is gradually brought back into close juxtaposition with the body section 18. Following this, the required bolts are inserted thereby to securely connect flanges 22 and 24 together. The hinge assembly 36 may be allowed to remain on the vessel 10 as a permanent fixture or, alternatively, it may be removed following completion of the installation procedure.
In addition to the savings in time and cost as noted above, this novel method positions the top section 20 of the vessel onto the lower or body section 18 with great accuracy thus minimizing the problems previously involved in centering one section properly relative to the other. Thus, the possibility of damage occurring during the replacement operation is reduced as compared with prior art techniques.
It is further contemplated that this removal and replacement technique may lead to a change in the general relining practice normally carried out following 1200 to 1800 heats. Rather than doing the time-consuming repairs on the vessel top on the site, it may be more advantageous to replace the top section completely and to do the repairs "off site" between relines. In this case the replacement top section to be installed is pre-bricked with the refractory lining prior to installation. This saves masonry time during the rebuilding operation. The additional weight from the brick work should offer no substantial problem during installation and the brick work should not suffer any damage because of the carefully controlled installation technique afforded by the invention. In addition, the ease with which the vessel flange joints 22 and 24 can be opened and closed by the method of the invention makes it quite simple to install any shims required in the flange joint. Due to distortion from heat and loading, such shimming is frequently required.
It will be apparent to those skilled in the art that various modifications, changes, and additions may be employed in carrying out the method described and illustrated herein, without departing from the spirit and scope of the invention as indicated by the appended claims.