Cross-Reference
This invention is an improvement on the anchoring mechanism shown and claimed in my prior U.S. Pat. No. 3,386,407.
Brief Summary of the Invention
The essential feature of the invention is a dual anchor assembly. Each anchor assembly includes two anchors, a pulley, a first line means extending from the lower anchor to the pulley support, second line means extending from a permanent connection with the upper anchor through the pulley to the vessel, and a releasable temporary connection between the upper anchor and a connecting element located on the second line means and spaced from the pulley toward the vessel. The two anchors are implanted and are pulled towards each other by the main anchor line, exerting its force through the pulley, and thereby are firmly embedded in the bottom.
Modifications of the dual anchor assembly may include block and tackle arrangements between one or both anchors and the pulley to increase the mechanical advantage for tightly embedding the anchors.
A dual anchor assembly as described is implanted in the bottom by first implanting the lower anchor in the bottom in conventional fashion. Thereafter the line is drawn by the vessel and paid out until the pulley and the second anchor both rest on the bottom. The temporary connection between the line and the upper anchor is then released. The line is then tensioned to turn the second anchor, if necessary, and implant it in a direction opposite to the direction of implantation of the first anchor. The vessel is then anchored by the anchor assembly including two opposed anchors which are pulled toward each other by the single line from the vessel.
This anchor assembly provides a nearly horizontal pull on each anchor by a vertical or nearly vertical line, without the necessity of using substantial scope (the diagonal distance between the anchor and the vessel, conventionally about five or six times the water depth).
The line may be transferred from the vessel to a buoy or to some more complex structure which is to be moored in place. When such a complex structure, e.g., a drilling rig, is to be anchored, several dual anchor assemblies can be engaged at the bottom at peripherally spaced points around the drilling rig, each assembly comprising a "single point mooring" .
Drawings
FIG. 1 is a diagrammatic view showing a ship lowering a dual anchor assembly constructed in accordance with the invention.
FIG. 2 is a view similar to FIG. 1, showing the lower anchor of the assembly engaged with the bottom.
FIG. 3 is a similar view showing the upper anchor of the assembly touching the bottom, while the ship proceeds.
FIG. 4 is a view showing the releasing of the temporary connection between the line and the upper anchor.
FIG. 5 shows the line tightened to engage both anchors firmly with the bottom and facing in opposite directions.
FIG. 6 shows the anchor line transferred from the ship of FIG 5. to a buoy.
FIG. 7 shows a complex structure, which may be a drilling rig, mounted on the bottom and guyed by four dual anchor assemblies.
FIG. 8 is an elevational view, showing a dual anchor assembly in accordance with the invention, engaged with the bottom, and showing in dotted lines the positions of the parts when the releasable connection is engaged.
FIGS. 9, 10, 11 and 12 are views similar to FIG. 8, showing modifications.
Detailed Description
FIG. 1 shows a ship 1 lowering by a conventional winch an anchor assembly including a lower anchor 2, an upper anchor 3, a pulley block 4, a first line or anchor pennant 5 extending between the anchor 2 and the pulley block 4 and a main line 6 shackled to the upper anchor 3 and extending over a pulley 7 on the pulley block and thence upwardly to the ship 1. A releasable temporary connection 10 is provided between the upper anchor 3 and a point on the line 6 spaced above the pulley block 4. In the positions shown in FIG. 1, the ship is proceeding toward the right and has lowered the anchor assembly so that the lower anchor 2 has not quite reached the bottom.
In FIG. 2 the anchor 2 has engaged the bottom and has been dragged by the ship so as to embed itself partially in the bottom. The crew of the ship having discovered this engagement by means of a tension measuring apparatus on the line 6 is now paying out the line 6 at a faster rate than occasioned by the forward movement of the ship so that the block 4 and the upper anchor 3 are now moving downwardly toward the bottom.
In FIG. 3, the block 4 and the anchor 3 have reached the bottom. The removal of the weight of anchor 3 from line 6 is effective to release the connection 10, which may consist of a hook 10a fastened to the line 6 and a ring 10b on the anchor 3. Other suitable releasable connections may be used. The release may be controlled from the ship or may be automatic. Release of connection 10 is shown in FIG. 4.
The forward motion of the ship then pulls on the anchor line 6, thereby acting through the pulley 7 to embed both anchors 2 and 3 firmly in the bottom.
If the anchor 3 comes to rest on the bottom with its shank pointing toward the anchor 2, then the embedding of anchor 3 starts immediately with the pull on the line 6 after the connection 10 is released. If the anchor 3 comes to rest with its shank pointed in some other direction, then the initial pull on the line 6 after the release of the temporary connection is effective to turn the anchor and orient its shank toward the anchor 2, after which the embedding of anchor 3 starts. It is thus ensured that the two anchors are implanted in oppositely facing directions by a single line having its lower end running over a pulley located between the two anchors.
FIG. 5 shows the moored ship after the line 6 has been tensioned. While the ship is shown vertically over the pulley 7, that line might possibly extend at a substantial angle to the vertical, while the pull on both anchors is almost horizontal.
In FIG. 6, the upper end of the line 6 has been transferred from the ship 1 to a buoy 11, which is now firmly anchored to the bottom by the line 6 and the anchor assembly. Any slackening of the line 6 is readily taken up by the springing of the lines and movement of the pulley 7, and can be further compensated at the buoy if desired.
Fig. 7
This figure shows four anchor assemblies 12, 13, 14 and 15 connected by their respective lines 6 to the surface end of a structure 16, which rests on the bottom, and is illustrated as serving a tanker 17. Alternatively, the structure so anchored may be floating. The lines 6 are mooring lines which collectively guy the upper end of the structure 16, to hold it effectively against lateral movement or against vertical tension.
Fig. 8
FIG. 8 shows in greater detail the anchor assembly of FIGS. 1 to 6. The anchor 2 is connected by line 5 to the pulley block 4. The anchor 3 is permanently connected to the end of line 6 which extends over the pulley 7 on the block 4 and thence upwardly to the ship. The releasable temporary connection 10 is shown as a hook 10a fastened to the line 6 and a ring 10b fastened to the shank of the anchor 3.
Fig. 9
The anchor assembly in this figure has been modified from that of FIG. 8 by provision of a pulley 21 on the anchor 3. The main line 22 now extends from the modified pulley block 23 over the pulley 21, thence over the pulley 7 on the block 23 and upwardly to the ship.
Fig. 10
In this modification, the pulley block carries two pulleys 7 and 24. The main line 25 starts from an end made fast to the anchor 3 and extends over pulleys 24, 21 and 7 vertically to the ship.
Fig. 11
In this figure, a pulley 31 has been added to the anchor 2 and a modified pulley block 32 carries two pulleys 33 and 34. The anchor 3 carries only the single pulley 21. The main line 35 extends from the pulley block 32 over the pulley 31 thence over pulleys 34, 21 and 33 to the ship.
Fig. 12
In this modification, the anchor 2 carries two pulleys 31 and 36. A modified pulley block 37 carries four pulleys 41, 42, 43 and 46. The anchor 3 carries two pulleys 21 and 44. The main line 45 extends from the pulley block 37 over the pulleys 31, 42, 44, 41, 36, 46, 21 and 43 to the ship.
In FIG. 11, there is provided one pair of pulleys on the two anchors, over which pair of pulleys the main line is guided before passing over the last pulley 33 on the pulley block to the ship.
In FIG. 12, there are two pairs of pulleys, namely 31, 21 and 36,44. The main line passes sucessively over those pairs of pulleys before passing over the final pulley 43 and upwardly to the ship.
In FIGS. 10-12, wherever two pulleys are mounted on the same support, they are shown on vertically spaced axes so as to clarify the drawing. In a practical structure, they may be aligned on one axis, in accordance with the usual block-and-tackle practice.
A conventional anchor pennant and surface buoy can be fastened to one of the anchors before deployment, to assist in locating and retrieving the anchors, if desired.
By selecting the mechanical advantage of the block and tackle employed, this mooring system allows selection of the ratio between the tension in the main line and the forces applied to the anchors. That tension and those forces may be varied as required for different installations, which may differ widely, e.g., for different depths.
FIGS. 8, 9 and 10 show the anchors being deployed, while FIGS. 11 and 12 show the anchors after implantation and development of tension in the lines.
The lifting of the pulley block is effective to lift the pulleys and the lines between the anchors off the bottom.
Regardless of the azimuthal orientation of the main line between the pulley block and the surface, the pull on each of the two anchors is always substantially toward the other anchor, i.e., always substantially in the direction of its original implantation and hence always substantially in a direction to increase that implantation and not to drag the anchor free.
While the pulleys 7, 24, 33, 43 and others have been shown and described as being mounted on a pulley block, it should be understood that other suitable equivalent supports, in which one or more pulleys may be journaled, may be employed in substitution for any of the pulley blocks illustrated. The term "pulley block" as used in this specification and claims is a generic term inclusive of such equivalent supports.